Wood Heating & District Heating
Are you planning to build or expand a heating network? Then you’re in the right place. At Heizomat, we have already realized numerous heat generators for local and district heating networks. Whether peak load or base load boilers, cascades, or single systems – we have the right solution and the appropriate system for you.
It’s a major trend: neighborhood cooperatives, village communities, and small municipalities are relying on cooperatively organized local heating networks.
Heizomat assists in planning and implementing such projects and provides the necessary equipment and control units. We remain your long-term service partner. Whether peak load or base load boilers, cascade or single system – with Heizomat solutions, you ensure reliable and sustainable energy production for your customers.
Heizomat in Action (please click)
- Local Heating Cooperative Laub »
- Local Heating Cooperative Hechlingen »
- District Heating Network Dornhausen »
- Local Heating Cooperative Dittenheim »
- Grienberger Energy »
- Local Heating Wecker »
- District Heating Network Dürrenzimmern »
Local Heating Cooperative Laub
In 2025, a new local heating network for the entire village was established. The residents formed a cooperative and built the network independently.
Additionally, the first drivable push-floor discharge system was installed here to allow simple and fast unloading.
Details
- Push-floor discharge system
- 2x AK boilers, each 400 kW
- Pipeline network: 5.6 km
- Heats 65% of the village (112 connections)
To view this video you must allow external media (e.g. YouTube).
Local Heating Cooperative Hechlingen
The residents of Hechlingen wanted to move away from fossil fuels and toward affordable energy. They formed a cooperative and built the network independently. Initially, there were 73 interested participants.
Details
- 105 connections (65% of all village houses)
- Construction started 06/2023 – completed 11/2024
- Quadruple filling allows truck unloading in 15 min
- 2 x 400 kW Heizomat boilers
To view this video you must allow external media (e.g. YouTube).
District Heating Network Dornhausen
Under the motto #DORNHAUSENGOESGREEN, the planning team started the district heating project in 2014. Numerous hours were spent finding the optimal heating system.
A mix of biogas heat and wood chips turned out to be the most economical solution. Dornhausen finally “goes GREEN” with the first green RHK-AK 500 Heizomat delivered to this model village in Middle Franconia.
Project
- Heating network for the village of Dornhausen, Weißenburg-Gunzenhausen district
Connections
- Pipeline length: 4,776 m
- 52 house connections
Fossil fuel replaced
- Heating oil saved: approx. 90,000 liters
- CO2 reduction: approx. 261,000 kg per year
To view this video you must allow external media (e.g. YouTube).
Local Heating Cooperative Dittenheim
6,600 m of heat pipelines, 98 connected buildings, 26 planned connections, 103,000 liters of buffer volume, and two Heizomat RHK-AK boilers with 400 and 500 kW. These are the figures for the Dittenheim district heating supply.
The village with 1,800 residents is located in Middle Franconia, Weißenburg-Gunzenhausen district. Planning began in 2014, and the cooperative network started operation in January 2016, providing nearly the entire village with sustainable heat from wood chips and biogas.
Project
- Heating network with connected biogas plant
Connections
- 98 buildings connected
- 26 buildings planned
Fossil fuel replaced
- Approx. 96,000 liters of heating oil per year
- Approx. 278,400 kg CO2 per year
Grienberger Energy
Roland Grienberger is happy to drive through Pollenfeld without seeing any smoking chimneys. Grienberger operates a biogas plant and a Heizomat RHK-AK 500 wood chip boiler.
He supplies 53 households in Pollenfeld with heat through a local heating network. The business evolved from traditional farming to energy production, and we are proud to be part of this project.
Project
- Heating network with connected biogas plant
Connections
- 60 buildings connected
Fossil fuel replaced
- Approx. 90,000 liters of heating oil per year
- Approx. 261,000 kg CO2 per year
Local Heating Wecker
Martin Wecker’s heating network in Merching benefits the community, customers, and the environment. It relies on sustainable, environmentally friendly energy and high efficiency, heated by a Heizomat RHK-AK 200.
Project
- Heating network for the village of Merching
- Pipeline length: 359 m
Connections
- 5 buildings connected
- 2 buildings planned
Fossil fuel replaced
- Approx. 27,000 liters of heating oil per year
- Approx. 78,300 kg CO2 per year
District Heating Network Dürrenzimmern
While pipelines for the Nord Stream gas pipeline were being laid in the Baltic Sea, Dürrenzimmern, a district of Nördlingen, pursued a different idea: CO2-neutral heating with wood chips for the entire village.
The project began in 2013 with the installation of two Heizomat RHK-AK 400 boilers and became one of the first wood-chip-based heating networks in Germany.
Project
- Heating network for the village of Dürrenzimmern
Connections
- 70 buildings connected
Fossil fuel replaced
- Approx. 178,200 liters of heating oil per year
- Approx. 516,780 kg CO2 per year
Meet the family...
Once the trees have been felled, the raw material must be processed quickly. For optimal value, this also applies to small wood, tree tops and wood waste.
Learn more »